Architectural Design in Nigeria
Good construction starts before site work. SR Construction supports architectural design coordination so drawings, BOQs, approvals, structural assumptions, and construction decisions work together instead of conflicting after mobilization.
Built for Serious Nigerian Projects.
Port Harcourt remains the operational base. The national offer is project-specific: when the scope needs disciplined construction management, SR Construction can plan, coordinate, and report with a clear delivery model.
Clients who need drawings before pricing
Owners with drawings that need buildability review
Developers coordinating architects, engineers, and contractors
Public and institutional clients preparing tender documentation
Concept and layout coordination
Buildability and constructability review
Approval-document support where applicable
BOQ and construction-scope alignment
Principal architect and design-team roles listed on the company page
Design coordination already part of the core service mix
Project pages connect design, cost, and execution planning
Can you review drawings prepared by another architect?
Yes. Drawing review can identify buildability, scope, coordination, and BOQ risks before construction begins.
Do you support approval documentation?
Yes, where the project scope requires coordination with regulatory or approval processes.